{"id":3881,"date":"2026-07-13T12:06:28","date_gmt":"2026-07-13T10:06:28","guid":{"rendered":"https:\/\/s2control.com\/?p=3881"},"modified":"2026-07-13T12:06:57","modified_gmt":"2026-07-13T10:06:57","slug":"project-successfully-completed-at-gri-towers-in-sevilla","status":"publish","type":"post","link":"https:\/\/s2control.com\/en\/project-successfully-completed-at-gri-towers-in-sevilla\/","title":{"rendered":"Project successfully completed at GRI Towers in Sevilla"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">We are proud to announce that we have successfully completed a new project focused on improving industrial safety and performance in collaboration with a major client.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">What did the project involve?<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Installation, wiring, and calibration: Replacement of two worn-out Keyence RotoScanners with two state-of-the-art Leuze units, including their adjustment, programming, and calibration to ensure proper operation.<br>We also supplied, wired, and commissioned these two new units at their facility.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">What have we achieved with this?<br>\u2013 Greater reliability of the entire system.<br>\u2013 Maximum operational safety for the environment and workers.<br>\u2013 A significant leap in the plant\u2019s overall efficiency.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">We would like to thank GRI Towers Sevilla once again for trusting our team to carry out this key improvement at their facilities. We continue working to make the industry safer and more efficient every day!<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Translated with DeepL.com (free version)<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>We are proud to announce that we have successfully completed a new project focused on improving industrial safety and performance in collaboration with a major client. What did the project involve? Installation, wiring, and calibration: Replacement of two worn-out Keyence RotoScanners with two state-of-the-art Leuze units, including their adjustment, programming, and calibration to ensure proper [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":3873,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[],"tags":[],"class_list":["post-3881","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/s2control.com\/en\/wp-json\/wp\/v2\/posts\/3881","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/s2control.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/s2control.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/s2control.com\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/s2control.com\/en\/wp-json\/wp\/v2\/comments?post=3881"}],"version-history":[{"count":1,"href":"https:\/\/s2control.com\/en\/wp-json\/wp\/v2\/posts\/3881\/revisions"}],"predecessor-version":[{"id":3882,"href":"https:\/\/s2control.com\/en\/wp-json\/wp\/v2\/posts\/3881\/revisions\/3882"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/s2control.com\/en\/wp-json\/wp\/v2\/media\/3873"}],"wp:attachment":[{"href":"https:\/\/s2control.com\/en\/wp-json\/wp\/v2\/media?parent=3881"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/s2control.com\/en\/wp-json\/wp\/v2\/categories?post=3881"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/s2control.com\/en\/wp-json\/wp\/v2\/tags?post=3881"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}