{"id":3314,"date":"2025-09-10T09:32:08","date_gmt":"2025-09-10T07:32:08","guid":{"rendered":"https:\/\/s2control.com\/proyecto\/avonmouth-dock-bitumen-plant\/"},"modified":"2025-09-10T09:35:03","modified_gmt":"2025-09-10T07:35:03","slug":"avonmouth-dock-bitumen-plant","status":"publish","type":"proyecto","link":"https:\/\/s2control.com\/en\/proyecto\/avonmouth-dock-bitumen-plant\/","title":{"rendered":"Avonmouth Dock bitumen plant"},"content":{"rendered":"\n<p>The project was developed on the Siemens PCS7 platform and included the implementation of redundant systems with S7-400H controllers, ensuring maximum availability and operational safety. Around 900 field signals were managed, covering the complete automation of critical processes and ensuring reliable, flexible operation optimised for the plant&#8217;s production needs. <\/p>\n","protected":false},"featured_media":3311,"template":"","meta":{"_acf_changed":false},"categoria-proyecto":[19],"class_list":["post-3314","proyecto","type-proyecto","status-publish","has-post-thumbnail","hentry","categoria-proyecto-19"],"acf":[],"_links":{"self":[{"href":"https:\/\/s2control.com\/en\/wp-json\/wp\/v2\/proyecto\/3314","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/s2control.com\/en\/wp-json\/wp\/v2\/proyecto"}],"about":[{"href":"https:\/\/s2control.com\/en\/wp-json\/wp\/v2\/types\/proyecto"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/s2control.com\/en\/wp-json\/wp\/v2\/media\/3311"}],"wp:attachment":[{"href":"https:\/\/s2control.com\/en\/wp-json\/wp\/v2\/media?parent=3314"}],"wp:term":[{"taxonomy":"categoria-proyecto","embeddable":true,"href":"https:\/\/s2control.com\/en\/wp-json\/wp\/v2\/categoria-proyecto?post=3314"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}