{"id":3626,"date":"2025-10-07T13:09:27","date_gmt":"2025-10-07T11:09:27","guid":{"rendered":"https:\/\/s2control.com\/proyecto\/playa-de-carga-mahon\/"},"modified":"2025-10-07T13:10:21","modified_gmt":"2025-10-07T11:10:21","slug":"playa-de-carga-mahon","status":"publish","type":"proyecto","link":"https:\/\/s2control.com\/en\/proyecto\/playa-de-carga-mahon\/","title":{"rendered":"PLAYA DE CARGA MAH\u00d3N"},"content":{"rendered":"\n<p>New loading bay screens were implemented in the PTA&#8217;s HMI, corresponding to the pumping and filtration systems located 5 km away.<br\/>This required creating and configuring the screens, as well as directing them to third-party remote PLCs (Siemens S7-1500), ensuring the correct integration and supervision of processes from the PTA.<\/p>\n\n<p><\/p>\n","protected":false},"featured_media":3625,"template":"","meta":{"_acf_changed":false},"categoria-proyecto":[18],"class_list":["post-3626","proyecto","type-proyecto","status-publish","has-post-thumbnail","hentry","categoria-proyecto-18"],"acf":[],"_links":{"self":[{"href":"https:\/\/s2control.com\/en\/wp-json\/wp\/v2\/proyecto\/3626","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/s2control.com\/en\/wp-json\/wp\/v2\/proyecto"}],"about":[{"href":"https:\/\/s2control.com\/en\/wp-json\/wp\/v2\/types\/proyecto"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/s2control.com\/en\/wp-json\/wp\/v2\/media\/3625"}],"wp:attachment":[{"href":"https:\/\/s2control.com\/en\/wp-json\/wp\/v2\/media?parent=3626"}],"wp:term":[{"taxonomy":"categoria-proyecto","embeddable":true,"href":"https:\/\/s2control.com\/en\/wp-json\/wp\/v2\/categoria-proyecto?post=3626"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}