{"id":3849,"date":"2026-03-25T10:46:15","date_gmt":"2026-03-25T09:46:15","guid":{"rendered":"https:\/\/s2control.com\/proyecto\/pta-ybarra\/"},"modified":"2026-03-25T10:55:06","modified_gmt":"2026-03-25T09:55:06","slug":"pta-ybarra","status":"publish","type":"proyecto","link":"https:\/\/s2control.com\/en\/proyecto\/pta-ybarra\/","title":{"rendered":"PTA YBARRA"},"content":{"rendered":"\n<p>Expansion and modification of the Ybarra PTA plant, incorporating new processes and equipment to improve its performance and operational capacity. In addition, the existing polyelectrolyte preparation system was optimized, <br\/>adapting it to the facility\u2019s new requirements. <\/p>\n\n<p><\/p>\n","protected":false},"featured_media":3847,"template":"","meta":{"_acf_changed":false},"categoria-proyecto":[52],"class_list":["post-3849","proyecto","type-proyecto","status-publish","has-post-thumbnail","hentry","categoria-proyecto-52"],"acf":[],"_links":{"self":[{"href":"https:\/\/s2control.com\/en\/wp-json\/wp\/v2\/proyecto\/3849","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/s2control.com\/en\/wp-json\/wp\/v2\/proyecto"}],"about":[{"href":"https:\/\/s2control.com\/en\/wp-json\/wp\/v2\/types\/proyecto"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/s2control.com\/en\/wp-json\/wp\/v2\/media\/3847"}],"wp:attachment":[{"href":"https:\/\/s2control.com\/en\/wp-json\/wp\/v2\/media?parent=3849"}],"wp:term":[{"taxonomy":"categoria-proyecto","embeddable":true,"href":"https:\/\/s2control.com\/en\/wp-json\/wp\/v2\/categoria-proyecto?post=3849"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}